Photovoltaic plant and battery storage at the Rio Maior AAE
Storage unit at sunset at the Rio Maior AAE

Business hosting area

AAE Rio Maior

Redevelopment of the Rio Maior Business Hosting Area, for the Municipality of Rio Maior, as part of the 6 AAEs redeveloped by Bright in Portugal.

What was done

  • Renewable energyProduction and storage for self-consumption and CER
  • Sustainable mobilityElectric and hydrogen
  • 5GNetwork coverage
  • FiresPrevention and protection
6,01 MWpPhotovoltaic capacity · 9 386 solar panels
16Charging points · 6 DC (60 to 360 kW) and 10 AC (22 kW)
5,9 MWhBattery energy storage
102 kgHydrogen production and storage

Energy & renewables, electric mobility · PRR Component 7